Los Angeles New Primary Center #5
Primary Center #5 consisted of two buildings with a total of 34,113 square feet and 16 classrooms on a 1.9 acre site. A one-level underground parking structure was included in the design in order to maximize the playground area. The budget totaled over $23M. This project was designed by the Cunningham Group and constructed by DJM Construction. JGMC service dates occurred from February 2003 to July 2005.